Owner designed home and owner built.

Owner Builder

Spantec team were always helpful during design stage and installation - furthermore in the footing pier design.

We started with a challenging DA then combined that with a challenging building site - with regards to land slip/bushfire/flood zone. Geotech report declared piers up to 5m depth. Bushfire declared BAL40, flood zone was .3m above natural ground level - not too bad.
We intended to build a modern family home with nice clean exterior lines and an appealing open plan interior without a perplexed finish. This suggested no timber skirting, no door or window architrave and a straight line pattern on the doors. And of course, cornice was prohibited. Square set completed all ceiling/wall joins. Technology is essential so the installation included C-BUS automation that controls the AC, lights, heated floors, electric blankets. Door entry is via keypad and connected to the home network. Network cabling is NBN ready and centralises a network drive - allowing all devices to backup to the drive with a scheduled plan. Just plug and play, no need to think about anything!

Click to share

Share page?

×